Building the House
The whole project should cost around $5000 including labor.
The labor part is $2500.
We were told it will be completed in 3 weeks.
Here is some pictures. You can click on photos to enlarge it.
Building Site November 13 2008
This is the land that we cleared for a building site. So far it is untouched. The contractor - Ken and his family lives in vicinity. It will be beneficial for them, since they do not live far away from the building site and it is good for us since they can keep an eye on what is happening. Sometimes people steal materials. Hopefully, that will not happen. I will update you on the progress.
First week November 21, 2008
Horse shoe was not in the contact that we signed with building team. It is good that there is no charge for it. :) We did not realize how steep is the building site until the beams where in.
December 02, 2008
The progress is vivid. The first floor is coming here. The weather is being good to us so far allowing to advance according to the proposed schedule.
December 04, 2008
Rainy weather has been keeping us from advancing. There has been some confusion on which side the sliding doors and windows are going, but we were able to clarify it. The building team had only one complaint that there is no supervisor. They want us to provide pretty women for supervision purposes, so the work can be completed faster.
The guy on the picture is Justin. He has taught us to chew the pine needles. He explained that it is a natural remedy for a heartburn. I researched more about pine needles. It is funny that nature put such a great remedy free of charge for humans to use. I devoted the whole page on usage of pine tree needles. He also was able to identify cedar tree on the property. We are excited as we do know that those trees possess very good energy. Today I jumped on the floor to test how stable it was. I was not able to see any movements. We put pressure treated beams and unfortunately some concrete.
December 6, 2008
The frames are in. It looks scary high. We did not think that the building will sit that high in the air. On the back it will be 3 sliding doors. Since we opted out of electricity, we need plenty of light.
December 8, 2008
Progressing here as we got the second wall ready. A little more and we should be done.
December 12, 2008
Covering sides.
December 14, 2008
Roof is coming slowly and gradually.
December 17, 2008
Reinforcing second floor.
December 21, 2008
Mother Nature has slowed us down with constant rain. The project delivery time is delayed at this time. We shall see as we go forward.
December 25, 2008
Window is installed. Covering the roof.
January 7, 2008
House is ready.
Truth About Digital TV
Subliminal Messages
Squirrel's Preaching
Money as Debt
Indigo Children
Black Friday Madness
How to Stop Watching TV
How to Stop Junk Mail
10 Facts About Pine Needles
How to Live Below Means
The Essene Gospel Of Peace
Life and Death
7 Day Fasting Diary
10 Tips For Successful Fasting
10 Day Raw Food Diet